Power,Distribution and transmission infrastructure

Civil and electrical-enabling packages across distribution and transmission networks, delivered with tier-one contractors, network operators and infrastructure partners.

What Flomar does in power

  • Civil and structural foundation works at the 500kV Merotherie Energy Hub in the Central-West Orana REZ
  • 11kV and 22kV distribution packages self-performed as a Level 1 ASP on the Ausgrid and Endeavour Energy networks
  • Around 5km of electrical conduit and 8.5km of 22kV and LV cable hauled on one package at Upper South Creek - independently verified by the principal, Ausconnex
  • In-ground service routes, joint bays, pits, pillars and padmount substations
  • 11kV asset relocations ahead of construction on the M12, M7-M12 and Mulgoa Road corridors
  • Live cutovers and outage-window work sequenced around energised assets
  • Cable pulls engineered to manufacturer tension and bend-radius limits
  • Underbore drills beneath constraints on live routes

Scope shown is Flomar's own package on each job, never the whole-project figure. How each discipline is self-performed - method, plant and specifications - lives on the capability pages.

Market evidence

Published projects17
Serving capabilities4
Scope basisFlomar package only
Delivery regionNSW
View projects in this market