Upper South Creek Advanced Water Recycling Centre
Electrical works connecting Sydney Water's Upper South Creek Advanced Water Recycling Centre to the Endeavour Energy network.
Project overview
Sydney Water's Upper South Creek Advanced Water Recycling Centre is new water infrastructure at Kemps Creek, developed to support the needs of growing communities in Western Sydney.
Flomar worked with Ausconnex to deliver the electrical-enabling package connecting the facility to the Endeavour Energy network. The package covered the conduit route, cable hauling, underbores and two new switching stations.
Flomar's scope of works
- Installation of about 5 km of electrical conduit for the Endeavour Energy network
- Hauling of 8.5 km of 22kV copper and low-voltage cable
- Multiple underbore drills beneath constraints along the route
- Construction of two new switching stations
Scope highlights
- About 5 km of electrical conduit
- 8.5 km of 22kV copper and LV cable hauled
- Two new switching stations
- Multiple underbore drills
Project register
Value bands cover Flomar's own package only, never the whole-project figure, and are provided on request.