Civil works for battery storage at Emu Plains, including equipment pads, drainage, pavements, bioretention, an acoustic wall and fencing.

Renewable energyTransmission substations & switching stations
Principal clientAusconnex
LocationEmu Plains, NSW
StatusProject showcase
SectorRenewable energy

Project overview

Emu Plains is a battery energy storage development in Western Sydney.

Flomar's site civil package for Ausconnex covers battery and power-skid pads, drainage, pavements, a bioretention basin, an acoustic wall and site fencing.

Flomar's scope of works

  • Battery pads, power-skid pad and light-column footings
  • DGS40 fill, pavement types 1 and 2, kerb, flush kerb and dish drains
  • Subsoil drainage and reinforced concrete pipe drainage
  • Bioretention basin with Filterra media
  • Acoustic wall with concrete piles, steel posts and Hebel panels
  • Turf, palisade fencing and gate

Scope highlights

  • Battery and power-skid pads
  • Drainage and bioretention basin
  • Fill, pavements and kerbs
  • Acoustic wall
  • Turf and palisade fencing

Project register

Principal clientAusconnex
LocationEmu Plains, NSW
StatusProject showcase
ValueOn request

Value bands cover Flomar's own package only, never the whole-project figure, and are provided on request.

Project context

Emu Plains BESS site location in annotated aerial imagery
Aerial view of site preparation and earthmoving plant at Emu Plains BESS
Overhead view of the Emu Plains BESS site and adjoining substation
Aerial view of the prepared Emu Plains BESS site beside the substation

Working out who to put on your next tender?

Tell us the civil and electrical-enabling scope. We will tell you plainly what we self-perform and where we partner.

(02) 9550 0658