Concrete structures, formwork, reinforcement and pour (FRP)

Suspended slabs, HV pits, stormwater structures, retaining walls and rigid pavement - formwork, reinforcement and pour (FRP).

Depot slab8,000m²
Cut-and-cover tunnels2
StandardsAS3600 / AS3610

Self-performed scope

Flomar self-performs structural and civil concrete - formwork, reinforcement and pour (FRP), by our own crews. The register runs from suspended slabs and staircases to large HV pits, complex stormwater structures, rigid concrete pavement, kerb and gutter, footpaths and pram ramps. At depot scale that has meant 8,000m² of 250mm slab at the Interfleet maintenance facility; in a live rail corridor, two cut-and-cover tunnels at Chalmers Street; and in Canberra, the large, complex retaining wall enabling the city's light rail at Raising London Circuit. Formwork to AS3610, concrete to AS3600.

What this includes

  • Suspended slabs and staircases
  • Data-centre platforms, generator slabs and columns, and guardhouse structures
  • Large HV pits and stormwater structures
  • Retaining walls and cut-and-cover structures
  • Rigid pavement, kerb, gutter, footpaths and pram ramps
  • Formwork to AS3610, concrete placement to AS3600

Our own crews, plant and method

We form, reinforce and pour with our own crews to the structural detail - falsework and formwork, reinforcement fixing, placement, finishing and curing, with ITPs and hold points on every structural element. Precast is used where it is the better answer: pits, headwalls and elements installed and stitched into the in-situ work.

Plant & method

  • Formwork and falsework
  • Reinforcement and placement crews
  • On-site and precast elements

Work on site

Aerial view of concrete foundations under construction
Concrete pump and timber formwork beneath transmission structures
Column formwork and reinforcement prepared for concrete placement
Completed concrete columns beside an industrial building
Reinforcement and temporary supports for a concrete structure
Column formwork and concrete foundations inside an excavation
Concrete services trench inside a fenced excavation
Long concrete trench with installed penetrations
Concrete trench and access crossing
Concrete trench walls during curing
Workers preparing formwork beside concrete trench walls
Excavator working beside a concrete trench
Crews working on concrete trenches and foundations
Workers and excavation plant beside concrete trench walls
Intersecting concrete trenches and foundation walls
Crew working along a completed concrete trench
Braced concrete trench walls and installed service penetrations
Fresh concrete platforms with timber formwork
Reinforcement prepared for a concrete slab
Workers preparing reinforcement and timber formwork

Working out who to put on your next tender?

Tell us the civil and electrical-enabling scope. We will tell you plainly what we self-perform and where we partner.

(02) 9550 0658