Central-West Orana REZ - Merotherie Energy Hub
Civil and form, reo and pour (FRP) works at the Merotherie Energy Hub in the Central-West Orana Renewable Energy Zone.
Project overview
The Central-West Orana Renewable Energy Zone transmission project is building new transmission lines, energy hubs and switching stations to collect renewable generation across the region and connect it to the NSW grid. The Merotherie Energy Hub links the zone's 330kV infrastructure with its 500kV transmission network.
Flomar's package for Acciona is civil and form, reo and pour (FRP) works: footings, cable trenches, conduits, pits and drainage. The work supports substation buildings and equipment; Flomar does not carry out works on the 500kV network on this project.
Flomar's scope of works
- Excavation of footings and trenches, followed by backfill and compaction
- Supply and installation of reinforcement, earthing connections and conduits
- Supply and installation of formwork to AS3610
- Concrete placement, compaction and curing for substation footings
- Cast-in-situ and precast cable trenches, conduits, pits, covers and cable trays
- Stormwater and subsurface drainage, headwalls, scour protection and kerbs
- Footings for substation buildings and equipment
Scope highlights
- Civil and FRP works
- Substation building and equipment footings
- Cable trenches, conduits, pits and covers
- Stormwater and subsoil drainage
- Formwork to AS3610
Project register
Value bands cover Flomar's own package only, never the whole-project figure, and are provided on request.
Working out who to put on your next tender?
Tell us the civil and electrical-enabling scope. We will tell you plainly what we self-perform and where we partner.
(02) 9550 0658