Skip to content

Battery storage civils, from pad to connection

Civil packages for battery storage sites, from earthworks and pads to drainage and in-ground services.

Self-performed scope

Flomar delivers the civil works battery energy storage sites depend on: bulk earthworks, equipment pads, foundations, access roads, drainage, conduits, pits, fencing and reinstatement. The same crews and plant can deliver the associated substation and network connection civils.

What this includes

  • Bulk earthworks and equipment pads
  • Foundations, pile footings and light-column footings
  • Access roads, subsoil and stormwater drainage
  • Acoustic walls and bioretention
  • Security fencing and reinstatement
  • Electrical conduits, pits and earthing civils
  • Regional mobilisation for energy projects

Our own crews, plant and method

The site is delivered as a coordinated civil package: establish and trim the platform, build foundations and equipment pads, install drainage and in-ground electrical routes, then complete access, fencing and reinstatement.

Plant & method

  • Earthmoving and haulage fleet
  • Concrete and foundation crews
  • Drainage and in-ground services plant

Work on site

Battery storage units and crane on site
Aerial view of battery storage installation beside a substation
Battery equipment and substation viewed from above
Equipment foundations and service routes viewed from above
Aerial view of installed foundations and electrical equipment

Working out who to put on your next tender?

Tell us the civil and electrical-enabling scope. We will tell you plainly what we self-perform and where we partner.

(02) 9550 0658