Argenton BESS Civil Works
A battery energy storage system integrated into the live Argenton zone substation site.
Project overview
The Argenton project adds battery energy storage within an operating Ausgrid zone substation yard, integrating new storage equipment and supporting infrastructure into a constrained brownfield network site.
Flomar's package covers the civil and in-ground works inside the operating Ausgrid yard: earthworks and demolition, equipment footings, oil containment, drainage, electrical conduits and earth-grid civils. A fire hydrant extension is also included in the package.
Flomar's scope of works
- Bulk earthworks and demolition inside a live substation yard, including reuse of existing yard rock
- Pile footings for BESS, PCS, switchgear and kiosk equipment
- Concrete oil-containment pits with sumps, filtration pits and flame-trap drainage
- New stormwater drainage - pipework, pits, headwall and yard-rock washout
- Electrical conduits with concrete haunches, bedding and compacted backfill
- Earth-grid civils - buried copper conductor, earth electrodes and crushed rock to NS222
- Fire hydrant system extension, including design, installation, testing and commissioning within the package
Scope highlights
- Live substation earthworks and demolition
- BESS, PCS, switchgear and kiosk footings
- Oil containment and stormwater drainage
- Electrical conduits and NS222 earth-grid civils
- Fire hydrant extension
Project register
Value bands cover Flomar's own package only, never the whole-project figure, and are provided on request.
Working out who to put on your next tender?
Tell us the civil and electrical-enabling scope. We will tell you plainly what we self-perform and where we partner.