Mitchell Line BESS Civil Works
A battery energy storage system developed beside the Mitchell Line zone substation at Muswellbrook.
Renewable energyTransmission substations & switching stations
Wider-project visualisation supplied by Flomar. This image illustrates the wider project; Flomar's own work is described below.
Principal clientAusgrid
LocationMuswellbrook, Upper Hunter NSW
StatusIn delivery as at July 2026
SectorRenewable energy
Project overview
The Mitchell Line project adds battery energy storage on a greenfield site beside the existing zone substation at Muswellbrook, extending storage infrastructure within the Ausgrid network.
What Flomar self-performs
- Site establishment, new entry road, bulk excavation and building platforms
- Strip footings for BESS units and pile footings and caps for PCS equipment
- Concrete oil-containment pits with sumps and DICL oil-containment drainage
- Stormwater drainage, swales and oil filtration pits
- New fire hydrant system connected into the existing service
- Earth-grid civils to NS222 and electrical conduits with concrete haunches
- Security fencing, gates and site reinstatement with as-built handover
Key quantities
- BESS civil package
- Footings, oil containment + fire services
- Ausgrid network standards incl. NS222
Project register
Principal clientAusgrid
LocationMuswellbrook, Upper Hunter NSW
StatusIn delivery as at July 2026
ValueOn request
Value bands cover Flomar's own package only, never the whole-project figure, and are provided on request.