Mitchell Line BESS Civil Works
A battery energy storage system developed beside the Mitchell Line zone substation at Muswellbrook.
Project overview
The Mitchell Line project adds battery energy storage on a greenfield site beside the existing zone substation at Muswellbrook, extending storage infrastructure within the Ausgrid network.
Flomar's package covers site establishment, the new entry road, equipment platforms and footings, oil containment and drainage. It also includes a new fire hydrant system, earth-grid civils and conduits, security fencing, reinstatement and as-built handover.
Flomar's scope of works
- Site establishment, new entry road, bulk excavation and building platforms
- Strip footings for BESS units and pile footings and caps for PCS equipment
- Concrete oil-containment pits with sumps and DICL oil-containment drainage
- Stormwater drainage, swales and oil filtration pits
- New fire hydrant system connected into the existing service
- Earth-grid civils to NS222 and electrical conduits with concrete haunches
- Security fencing, gates and site reinstatement with as-built handover
Scope highlights
- New entry road and equipment platforms
- BESS strip footings and PCS pile caps
- Oil containment and stormwater drainage
- New fire hydrant system
- NS222 earth-grid civils and conduits
- Security fencing and site handover
Project register
Value bands cover Flomar's own package only, never the whole-project figure, and are provided on request.
Working out who to put on your next tender?
Tell us the civil and electrical-enabling scope. We will tell you plainly what we self-perform and where we partner.
(02) 9550 0658