Kurri Kurri BESS Civil Works

A battery energy storage system developed on a greenfield site beside the Kurri Kurri zone substation.

Renewable energyTransmission substations & switching stations

Wider-project visualisation supplied by Flomar. This image illustrates the wider project; Flomar's own work is described below.

Principal clientAusgrid
LocationKurri Kurri, Hunter NSW
StatusIn delivery as at July 2026
SectorRenewable energy

Project overview

The Kurri Kurri project adds battery energy storage on a greenfield site next to the existing zone substation, providing new storage infrastructure alongside the live Ausgrid network.

What Flomar self-performs

  • Bulk earthworks, permanent batters and building platforms for the PCS and BESS equipment
  • Pile footings, oil-containment pits with sumps, retaining and acoustic walls
  • Access structures - bridge and stairs to the existing substation, vehicular crossing and internal driveways
  • Stormwater and oil-containment drainage - pits, pipework, silt arrestor, retention basin and filtration pits
  • Earth-grid civils to NS222 and electrical conduits with fibre pit
  • Cable installation and testing to NS130
  • Security fencing, gates and reinstatement with as-built handover

Key quantities

  • BESS civil package
  • Greenfield site beside a live zone substation
  • Earth grid, conduits + cable testing to NS130

Project register

Principal clientAusgrid
LocationKurri Kurri, Hunter NSW
StatusIn delivery as at July 2026
ValueOn request

Value bands cover Flomar's own package only, never the whole-project figure, and are provided on request.