Skip to content

Combined service routes,coordinated end to end

Coordinated in-ground routes for electrical, communications, signalling, hydraulic and drainage services.

AccreditationLevel 1 ASP
RegisterNo. 5400
EnvironmentsLive substations

Self-performed scope

Flomar builds combined service routes that bring electrical, communications, signalling, hydraulic and drainage infrastructure through one coordinated corridor. The work covers service proving, excavation, conduit and pipe installation, pits, crossings, backfill, testing and as-built close-out across road, rail, airport and utility projects.

What this includes

  • Electrical, communications and signalling routes
  • Hydraulic, stormwater and drainage services
  • Precast and in-situ pits, crossings and conduit banks
  • Mandrel, rope, CCTV and compaction close-out

Our own crews, plant and method

The route is planned as one coordinated civil package. Existing services are proved first, then each trench, pit, conduit, pipe and crossing is installed to its own specification before backfill, compaction, proving and as-built close-out.

Plant & method

  • Excavation and trenching plant
  • Conduit, pit and pipe installation equipment
  • Survey, proving and testing equipment

Work on site

Conduits on a construction site
Conduit installation in an open trench

Working out who to put on your next tender?

Tell us the civil and electrical-enabling scope. We will tell you plainly what we self-perform and where we partner.

(02) 9550 0658