Canberra Light Rail Stage 2A - Combined Services Route
The combined services route (CSR) for the first extension of Canberra's light rail, from the city terminus to Commonwealth Park.
Project overview
Canberra Light Rail Stage 2A extends the existing route from the Alinga Street terminus to Commonwealth Park, forming the first section of the planned light-rail connection towards Woden.
Flomar builds the combined services route for Canberra Metro Constructions: trenches, conduit banks and pits for the main, local, irrigation and SCADA routes along the 1.7 km light-rail alignment. The package includes connections to wayside infrastructure and the existing Stage 1 route, deep excavations and night-shift road crossings.
Flomar's scope of works
- Cut and excavate CSR trenches for the main, local, irrigation and SCADA routes to design profiles
- Lay multi-way conduit banks with spacers, bedding, sweeping bends and bell mouths; mandrel-test and prove all conduits
- Supply and install precast and in-situ cable pits with lids and pit drainage to AS/NZS 3000 and AS 3996
- Conduit upturns and connections to wayside cabinets, metering switchboards, signal controllers, radio poles and overhead wiring masts
- Tie-ins to the existing Stage 1 CSR pits at Alinga stop
- Contractor-designed shoring and steel plates for deep trench and pit excavations
- Night-shift local-route road crossings with temporary pavement reinstatement
Scope highlights
- CSR along the 1.7 km light-rail alignment
- Main, local, irrigation and SCADA routes
- Multi-way conduit banks and cable pits
- Stage 1 route tie-ins at Alinga stop
- Deep excavation shoring
- Night-shift road crossings
Project register
Value bands cover Flomar's own package only, never the whole-project figure, and are provided on request.
Capabilities used
Working out who to put on your next tender?
Tell us the civil and electrical-enabling scope. We will tell you plainly what we self-perform and where we partner.
(02) 9550 0658