Canberra Light Rail Stage 2A - Combined Services Route
The first extension of Canberra's light rail from the city terminus to Commonwealth Park.
Rail
Wider-project context supplied by Flomar. This image illustrates the wider project; Flomar's own work is described below.
LocationCivic, Canberra ACT
StatusProject showcase
SectorRail
Project overview
Canberra Light Rail Stage 2A extends the existing route from the Alinga Street terminus to Commonwealth Park, forming the first section of the planned light-rail connection toward Woden.
What Flomar self-performs
- Cut and excavate CSR trenches for the main, local, irrigation and SCADA routes to design profiles
- Lay multi-way conduit banks with spacers, bedding, sweeping bends and bell mouths; mandrel-test and prove all conduits
- Supply and install precast and in-situ cable pits with lids and pit drainage to AS/NZS 3000 and AS 3996
- Conduit upturns and connections to wayside cabinets, metering switchboards, signal controllers, radio poles and overhead wiring masts
- Tie-ins to the existing Stage 1 CSR pits at Alinga stop
- Contractor-designed shoring and steel plates for deep trench and pit excavations
- Night-shift local-route road crossings with temporary pavement reinstatement
Key quantities
- 1.7km light-rail alignment
- Multi-way conduit banks + cable pits
- Live tie-ins to the Stage 1 route
Project register
LocationCivic, Canberra ACT
StatusProject showcase
ValueOn request
Value bands cover Flomar's own package only, never the whole-project figure, and are provided on request.