Belmont Desalination Plant Civil Works
Underground conduit, pit and cable works for the Phase 2 private 11kV connection to Hunter Water's Belmont desalination plant.
Project overview
Hunter Water's Belmont Desalination Plant will provide the Lower Hunter with a permanent, rainfall-independent source of drinking water. The 30-megalitre-per-day seawater reverse-osmosis plant includes an ocean intake and transfer pipeline, onshore pumping and treatment infrastructure, residuals discharge and connections to the existing water network. John Holland is the principal design and construction contractor.
Flomar is working with Ausconnex on the Phase 2 private 11kV connection package, building the underground route and installing the cables between the new high-voltage connection infrastructure and the plant's main switchboards.
Flomar's scope of works
- Trial holes, non-destructive excavation and service proving ahead of the cable route
- Supply and installation of underground conduits and six pits, with mandrel proving
- Installation and testing of new 11kV underground mains and earth cables
- Joint bay opened, maintained and closed for the cable jointer
- Craneage for cable-pulling preparation
- Hardstand cutting and removal for the route works
- Trench backfill and compaction to Ausgrid NS130
- Temporary surface restoration, traffic management and work-as-executed survey pickups
Scope highlights
- Phase 2 private 11kV connection
- Six pits
- 11kV cable installation and testing
- Joint-bay attendance for the cable jointer
- Cable-pulling preparation and craneage
- NDD and service proving
Project register
Value bands cover Flomar's own package only, never the whole-project figure, and are provided on request.
Working out who to put on your next tender?
Tell us the civil and electrical-enabling scope. We will tell you plainly what we self-perform and where we partner.
(02) 9550 0658