Overhead aerial imagery of the Mulgoa Road corridor at Penrith

Mulgoa Road Upgrade

11kV and communications relocations, street lighting, ITS and underground service routes across two stages of the Mulgoa Road Upgrade.

Roads & motorwaysPower
Principal contractorSeymour Whyte
Principal clientTransport for NSW
LocationPenrith, NSW
StatusStage 1 complete; Stage 2 in delivery as at November 2026
SectorRoads & motorways

Project overview

The Mulgoa Road upgrade increases capacity and improves the main route between Penrith, the M4 Motorway and surrounding communities through a staged corridor program.

Flomar has worked for Seymour Whyte across two stages under separate contracts. Stage 1 is complete and covered 11kV and communications relocations, street lighting and ITS routes. Stage 2 is in delivery and covers Endeavour Energy high-voltage, low-voltage and street lighting relocations, underground service routes and temporary lighting.

Flomar's scope of works

Stage 1 - complete

  • Relocation of multiple 11kV distribution assets
  • Relocation of communications assets
  • Construction of street lighting
  • Construction of new ITS routes

Stage 2 electrical relocation - in delivery

  • Open trenching and conduit installation for high-voltage, low-voltage and street lighting routes, with proving of existing ducts
  • Underbores beneath crossings, including send and receive pits
  • Joint bay construction
  • Cable hauling, jointing, termination and testing of high-voltage, low-voltage and street lighting cables, with earthing
  • Installation of a new switching station and padmount substation, with underground-to-overhead connections
  • New street light poles, luminaires, footings and pillars
  • Removal of existing poles, pillars, a pole substation and street lights

Stage 2 temporary lighting - in delivery

  • Temporary lighting columns, luminaires and concrete blocks

Scope highlights

  • Stage 1 complete; Stage 2 in delivery
  • 11kV and communications relocations
  • High-voltage, low-voltage and street lighting routes
  • Underbores, joint bays and cable installation
  • Switching station and padmount substation
  • Temporary lighting columns, luminaires and concrete blocks

Project register

Principal contractorSeymour Whyte
Principal clientTransport for NSW
LocationPenrith, NSW
StatusStage 1 complete; Stage 2 in delivery as at November 2026
ValueOn request

Value bands cover Flomar's own package only, never the whole-project figure, and are provided on request.

Project context

Overhead aerial imagery of the Mulgoa Road corridor at Penrith