Vaucluse Pump Station
New wastewater infrastructure redirecting untreated flows from Vaucluse to the Bondi Water Resource Recovery Facility.
Wider-project context supplied by Flomar. This image illustrates the wider project; Flomar's own work is described below.
Project overview
Sydney Water's Refresh Vaucluse and Diamond Bay project is building new pump stations, pipelines and supporting wastewater infrastructure to redirect flows from the area's remaining ocean outfalls to the Bondi Water Resource Recovery Facility for treatment. The work is intended to improve harbour and coastal water quality and protect community and marine health.
What Flomar self-performs
Pump-station utilities
- Installation of the pump-station and emergency-storage water feeds
- Ventilation ducting, induct vents and associated enclosures
- Electrical-pit drainage and valve-spill drainage
Power and electrical-enabling works
- Trenching, conduits, joint bays, backfill, restoration and as-built survey
- Kiosk-substation foundations, earthing and electrical service relocations
- HV, LV and street-lighting cable installation, jointing, termination, testing and commissioning
Retaining wall and substation access
- Demolition and replacement of the existing retaining wall
- Precast concrete sleeper wall installation
- Access stairs serving the new kiosk substation
Key quantities
- Pump-station utility services
- HV, LV + street-lighting package
- Retaining wall + substation access
Project register
Value bands cover Flomar's own package only, never the whole-project figure, and are provided on request.