M12 Motorway corridor and interchange in Western Sydney

M12 Motorway

ITS trenching, conduits and pits, conduit proving, distribution-board plinths and variable speed limit sign footings on M12 Central.

Roads & motorways
Principal contractorSeymour Whyte
Principal clientTransport for NSW
LocationM12 Central, between east of Badgerys Creek and Duff Road, Cecil Park NSW
StatusCompleted
SectorRoads & motorways
ProgramJune to August 2024 for conduit proving, plinths, footings and pits

Project overview

The 16km M12 Motorway connects The Northern Road at Luddenham with the M7 at Cecil Hills and provides direct access to Western Sydney International Airport. Seymour Whyte delivered the 7.5km central section for Transport for NSW, including seven bridges and a shared user path.

Flomar worked as a subcontractor on the M12 Central section, delivering ITS trenching, conduits, pits, conduit proving and pit lids for Seymour Whyte, and civil works supporting roadside ITS equipment for the project's ITS contractor.

Flomar's scope of works

ITS network trenching, conduit installation and pits

  • Trenching for the ITS conduit network
  • Installation of ITS conduits
  • Installation of ITS pits

Conduit proving and pit lids

  • Roping and mandrelling installed ITS conduits, including emergency stopping bays
  • Daily site measures marked up on issued drawings
  • Reporting blocked conduits and flooded pits
  • Vacuum truck support for pits requiring dewatering
  • Installation of lids on ITS pits by a dedicated crew

ITS distribution board plinths

  • Excavation and short connections to existing electrical, communications and earthing conduits
  • Bedding, formwork, conduits, bends, draw wire and marker tape
  • Concrete plinths to the footing design, with pre-pour inspection and test records

Variable speed limit sign footings and ITS pits

  • Drilling and forming 750mm-wide, 2m-deep footings, with form tubes
  • Concrete supply and placement, with compressive strength testing
  • ITS pits beside sign footings, with conduit connections

Scope highlights

  • More than 43km of individual conduits roped and mandrelled; not route length
  • 25 ITS distribution board plinths
  • 15 variable speed limit sign footings, each 750mm wide and 2m deep
  • About 20 ITS pits at the sign footings

Project register

Principal contractorSeymour Whyte
Principal clientTransport for NSW
LocationM12 Central, between east of Badgerys Creek and Duff Road, Cecil Park NSW
StatusCompleted
ValueOn request

Value bands cover Flomar's own package only, never the whole-project figure, and are provided on request.

Project context

M12 Motorway corridor and interchange in Western Sydney